webmaster : pirrene@onecert.fr
 Last revision: 02/10/2006

 

 

 

INFORMATIONS & NEWS

 

Micro-Wave Radiometer calibration : February 2005

The micro-wave ground radiometer used for the SMOS long-term campaign has been removed from its bench. Internal electronic devices have been checked/changed. It has been mounted inside the CNES anechoic chamber for a 3-days calibration test.

MIRES ONERA campaign : September 2006

The MIRES ONERA measurement campaign has been carried out in september near X1 building. More information will come soon.

PIRRENE workshops 2003, 2004:

The slides of the presentations proposed by participants are available on the PIRRENE ftp server:

Login: Password:

 

For further information: pirrene@onecert.fr