|
INFORMATIONS & NEWS
Micro-Wave Radiometer calibration :
February 2005
The micro-wave ground radiometer used
for the SMOS long-term campaign has been removed from its bench.
Internal electronic devices have been checked/changed. It has been
mounted inside the CNES anechoic chamber for a 3-days calibration
test.
MIRES ONERA campaign : September 2006
The MIRES ONERA measurement campaign
has been carried out in september near X1 building. More information
will come soon.
PIRRENE workshops 2003, 2004:
The slides of the presentations proposed
by participants are available on the PIRRENE ftp server:
For further information: pirrene@onecert.fr
|