|
Data
The data acquired on the PIRRENE site
is likely to be useful for the participating laboratories even if
they did not acquire it themselves. The PIRRENE web site will thus
first identify the various data acquired on the PIRRENE site by
its various participants. All of the data are available to PIRRENE
participants via the ftp.onecert.fr site (participants can request
access rights from pirrene@onecert.fr).
For other people who might be interested in the measurements, there
are two possibilities:
the data have not been protected in any way and can thus
be obtained directly on this web site;
the data are not yet ready for distribution but a request
may be sent to the project and/or measurement managers.
The measurements taken on the PIRRENE
site up to now are listed below and described in detail further
on. When data files are available, a descriptive file is provided.
The contact information for various managers has also been given.
meteorological measurements (continuous measurements,
free access)
atmospheric measurements by a sunphotometer
(continuous measurements, free access)
scintillometry between the X1 et X2 laser bases
(continuous measurements)
measurements for the SMOS project (continuous
measurements)
measurement campaign for 'Infrared radiometry
in the 3-5 µm spectral band
directional measurements
of heterogeneous scenes in the thermal infrared range (8-14 µm)
MERIS acquisitions
over PIRRENE site
| Meteorological
measurements (continuous measurements) |
top
|
A meteorological station maintained
by ONERA/DOTA continuously acquires the temperature, air pressure
and humidity, precipitation, wind direction and speed, total solar
radiation, radiation reflected by the ground and finally the ground
temperature. Each available file corresponds to one day's measurements
(the file has the following format "meteo_JJMMAAAA.txt")
and each column is described in the first two header lines (the
time given is universal time, i.e. GMT).
The last twenty day data are available
here.
ARPEGE meteorological (provided by
CNRM) are also available for PIRRENE participants:
To obtain other data, please ask pirrene@onecert.fr.
| Atmospheric
measurements by sunphotometer (continuous measurements) |
top
|
A sunphotometer has been installed
on the roof of the X1 base. It has been calibrated according to
NASA specifications in order to be accepted for the AERONET network
(HTML document ). The data are thus downloaded
once a day and then processed. They are not available on this site,
but may be seen directly on the AERONET site
in the 'DATA' feature and then by clicking on the 'Toulouse' site
(written in lower case letters). The
results are generally processed within 24 hours.
| Scintillometry
between the X1 et X2 laser bases (continuous measurements) |
top
|
The scintillometer operates continuously
between the X1 and X2 bases. The data are however not freely available.
Contact: pirrene@onecert.fr
| Measurements
for the SMOS project (continuous measurements) |
top
|
As part of the SMOS validation campaigns,
hydric sensors and temperature sensors have been placed in the ground
at various depths between 0 and 1 metres, for bare soil and fallow
land. The data are not yet freely available.
For people having a login/password
access, they can get the data through the following authentification:
Contact: Jean-Christophe.Calvet@meteo.fr,
Patricia.Derosnay@cesbio.cnes.fr
| Infrared
radiometry campaign in the 3-5 µm spectral band |
top
|
Most of the data were analysed and
published (in thesis or articles).
For instance an image acquired by the SC1000 infrared camera indicates
the contents of the work scene; the temperatures measured by a GRTRAD
(9-11 µm) radiometer for each of the materials are also available:
mesures_temperatures_materiaux_GRTRAD.xls
Contact: pirrene@onecert.fr
| Directional measurements of heterogeneous
scenes in the thermal infrared range (8-14 µm) |
top
|
The data acquired during the 2001 campaign were mainly analysed
in Alain Malaplate PhD Thesis, published in December 2001.
Contact: pirrene@onecert.fr
| MERIS acquisitions over PIRRENE site |
top
|
Systematic MERIS acquisitions are
programmed since October 2002.
Contact: pirrene@onecert.fr
|